qiao@hvtest.cc15871365102
  • YDJ 油入高電圧試験用変圧器AC耐電圧試験器

    YDJシリーズ50~300kV油入試験用変圧器は、主にコントロールボックス、試験用変圧器などで構成されています。ケーブル、電気部品、絶縁材の電源周波数AC DC耐電圧試験を実施でき、より大きな電圧レベル(kV)やカスタマイズも可能です。容量(KVA)など

    YDJ 油入高電圧試験用変圧器AC耐電圧試験器の製品詳細



    YDJ Oil Immersed AC/DC Hipot Test Set

    Product Introduction:

    YDJ Oil Immersed AC/DC Hipot Test Set features a compact and lightweight design with high integration and versatile functionality. It is highly portable and user-friendly, making it especially suitable for AC/DC withstand voltage testing of electrical equipment, components, and insulating materials in power systems, industrial enterprises, mining facilities, and research institutions. This series is an essential solution for high-voltage testing applications.


    Product Characteristics:

    1、The high-voltage test transformer features premium material selection, ensuring reliable quality and stable performance.

    2、It offers a wide voltage margin and is designed with a compact corona ring and minimal partial discharge.

    3、Utilizing advanced insulation materials, the transformer achieves a compact structure and lightweight design.


    Announcements 

    1. Complete the circuit as you expected. The hull of testing transformer and operation system must be well connected to the ground. Testing transformer' high voltage X end and measured winding F end must bewell connected to the ground. 

    2. In the cascading testing, the low voltage of second and third testingtransformer's is X end, winding F end and HV winding X end must be connected to the hull of transformer. The second and third transformer'shull must be connected to the ground through insulating frame. 

    3. Before power on, the adapter must be on the “zero” and then can turn on and boost voltage. 

    4. Sooth boosting the voltage through the regulator hand wheel from zero. The methods: quick rising (20s); slow rising (60s); extreme slow rising. After rising the voltage to 75% of your target voltage, we should boost by 2% per second until to the target one. At the same time monitor the measured equipment and instrument. In the process of boosting, if there is any abnormal phenomenon, we should cut off the power or step down the voltage at once. 

    5. After testing, we should step down the voltage in several seconds to the zero and power off. 

    6. This production cannot be used in the other parameter which in not allowed. Except necessity of testing, get on the power or cut off is not allowed. 

    7. In the high voltage testing, not only get the operation manual familiar but also obey to the national standard.








    あなたはおそらくそれも好きでしょう

    • 何か質問がある!

      いつでもお気軽にご連絡ください
      お問い合わせ
    • ご来店ください

      6号館、光学谷光学機械産業園区、高新5路84号、
      中国湖北省武漢市東湖新技術開発区

    • 私達に電子メールを送り

      qiao@hvtest.cc

    • お電話ください

      +86-15871365102